The project
The Corendon Mangrove Beach Resort will become a new 5-star luxury Ultra all-inclusive resort in Curaçao. The complex will house a large range of leisure facilities such as swimming pools, restaurants, bars an Aquapark and conference rooms, all of which are notoriously energy consuming. Sustainability is however a key requirement for this project which is why Dynaf was asked to design a solar PV system, able to supply energy for the 850 rooms and facilities that the resort should be able to accommodate. The first step of this project has as of 2019 been completed, resulting in the delivery of the first 640 kWp installed power, of the 2,3 MWp which will finally be installed.
Technical specifications
Solar PV panels | 1.684 panels | 380 Wp | JA Solar |
Inverters | 30 inverters | SMA | |
Installed Power | 640 kWp (of 2,3 MWp) | ||
ROI | 4.5 years |